< Back to easements list
Easement 701727
Implemented by Great Western Railway (GW)
Human-readable text
Passengers travelling to/from London Euston travelling via Winslow may doubleback through Bletchley via Milton Keynes Central on 28 November 2026 and 29 November 2026. This Doubleback easement is applicable in both directions.
Electronic easements
This easement has 2 associated electronic records.
Positive
-
Elec. easement 704542 — Doubleback
From 2026-11-28 to 2026-11-29 on weekends
If all of the below apply to the journey:
- starts at { London Euston [EUS] }
- passes through at least one of { Bletchley High Level [BLY] London Euston [EUS] Milton Keynes Central [MKC] Winslow [WNO] }
- passes through all of { Winslow [WNO] }
then the journey may double-back through { Bletchley High Level [BLY] London Euston [EUS] Milton Keynes Central [MKC] Winslow [WNO] }
-
Elec. easement 704543 — Doubleback
From 2026-11-28 to 2026-11-29 on weekends
If all of the below apply to the journey:
- ends at { London Euston [EUS] }
- passes through at least one of { Bletchley High Level [BLY] London Euston [EUS] Milton Keynes Central [MKC] Winslow [WNO] }
- passes through all of { Winslow [WNO] }
then the journey may double-back through { Bletchley High Level [BLY] London Euston [EUS] Milton Keynes Central [MKC] Winslow [WNO] }
Negative
-
There are no negative easement records