< Back to easements list

Easement 701727

Implemented by Great Western Railway (GW)

Human-readable text

Passengers travelling to/from London Euston travelling via Winslow may doubleback through Bletchley via Milton Keynes Central on 28 November 2026 and 29 November 2026. This Doubleback easement is applicable in both directions.

Electronic easements

This easement has 2 associated electronic records.

Positive

  • Elec. easement 704542 — Doubleback

    From 2026-11-28 to 2026-11-29 on weekends


    If all of the below apply to the journey:

    • starts at { London Euston [EUS] }
    • passes through at least one of { Bletchley High Level [BLY] London Euston [EUS] Milton Keynes Central [MKC] Winslow [WNO] }
    • passes through all of { Winslow [WNO] }

    then the journey may double-back through { Bletchley High Level [BLY] London Euston [EUS] Milton Keynes Central [MKC] Winslow [WNO] }

  • Elec. easement 704543 — Doubleback

    From 2026-11-28 to 2026-11-29 on weekends


    If all of the below apply to the journey:

    • ends at { London Euston [EUS] }
    • passes through at least one of { Bletchley High Level [BLY] London Euston [EUS] Milton Keynes Central [MKC] Winslow [WNO] }
    • passes through all of { Winslow [WNO] }

    then the journey may double-back through { Bletchley High Level [BLY] London Euston [EUS] Milton Keynes Central [MKC] Winslow [WNO] }

Negative

  • There are no negative easement records